Issues & Projects

The current status first. The full explanation and records are one click away.

How to use this page: “Published” means Hubert United has completed a public report. “Monitoring” means the matter is active. “Records requested” means important documents are still outstanding. These labels describe our work—not a final agency decision.

PUBLISHED · SCHOOLS

Eastern Onslow school capacity

What happened: Woodland Elementary relieved elementary crowding, but it added no middle- or high-school seats.

Why it matters: Swansboro Middle and Swansboro High remain over permanent-building capacity in the newest forecast.

Read the explanation and records →

PUBLISHED · ROADS & TRANSPORTATION

Queens Creek Bridge, traffic, and safety

What happened: NCDOT has identified bridge, crash, and corridor-safety needs.

Why it matters: The Queens Creek Bridge replacement is programmed, but construction is not scheduled to begin until 2033.

Read the transportation dossier →

MONITORING · DEVELOPMENT & ZONING

Sweet Briar conditional rezoning

Proposal: Up to 240 single-family lots on approximately 109.78 acres of a larger tract.

Questions being tracked: roads, schools, utilities, stormwater, wetlands, emergency services, and cumulative effects alongside other development.

Open the project file →

RECORDS REQUESTED · UTILITIES & DRAINAGE

Water, wastewater, and flood risk

What we are examining: available capacity, reservations, planned upgrades, stormwater systems, downstream effects, flood resilience, and who is responsible for improvements.

Review available source records →

ACTIVE · PUBLIC ACCOUNTABILITY

PlateRanger / ALPR records investigation

Documented: Onslow County paid SoundThinking $52,099 through two recorded payments.

Still unresolved: Records produced to date do not independently connect the Sheriff’s detention-revenue explanation to those expenditures.

Read what the records prove—and what they do not →

UTILITIES · ACTIVE RECORDS REVIEW

ONWASA’s 2020 Holly Ridge–Summerhouse capacity warning

A 305-page engineering study projected that the systems’ then-functional combined wastewater capacity would be exceeded by 2023 and advised beginning design in 2020–21. Hubert United has published the report, its central findings, its limitations and the still-missing follow-through.

PUBLISHED · UTILITIES

ONWASA’s 2025 wastewater performance report

The official report says Summerhouse treated no wastewater in 2025 while the Holly Ridge plant ran at an annual average of 104% of its permitted capacity. It also documents recurring operational problems and contains figures that do not always reconcile. Hubert United’s review links every major finding to the source and separates confirmed facts from open questions.

Last reviewed: September 9, 2026. Read Hubert United’s sourcing and correction standards.